Detailed insurance information
- Technical machinery repair support
- Priority settlement of contract documents
- Complaint if compensation is not satisfactory
- Rebuilt new base of operations (if needed)
- Temporary housing support if facilities, factories, houses are damaged
- Online contract renewal
1. CONTRACTORS’ ALL RISKS INSURANCE
a. Subject Matter Insured
All civil construction, and industrial construction such as::
• Home, office building, factory with included dormitory, school, hospital, theater, cinema, other cultural construction…
• Factory, plant.
• Road (including railway) and air port.
• Bridges, water supply and drainage construction, canals, ports…
b. Scope Of Cover
• Material damage: Cover for physical damage due to unexpected and unforeseen risks for all insured items occurs during the construction process by the risk is not excluded in the policy.
• Third party liability: FUBON will indemnify the Insured the amounts which the Insured shall become legally liable to pay as damages consequent upon:
• accidental bodily injury to or illness of third parties (whether fatal or not)
• accidental loss of or damage to property belonging to third parties
• all costs and expenses of litigation
• all costs and expenses incurred with the written consent of FUBON
2. ERECTION ALL RISKS INSURANCE
a. Subject Matter Insured
Erection and testing process:
• Machines, Equipments and parts such as: turbine, generator, steam boilers, internal combustion engine, electric motor, transformers, rectifiers, commutation devices…
• Machine tool, pumps, elevators, cranes, conveyors, cable lines.
• Printer, paper production machine, textile machine, high voltage power lines, pipelines, halls, storage tanks, containers, steel bridges.
• Industrial plant (electrical plant, iron and steel plant, chemical plant, high flood, paper plant, textile plant as well as other factory specializing in consumer goods.
b. Scope Of Cover
• Material Damage: Cover for physical damage due to unexpected and unforeseen risks for all insured items occurs during erection and testing process by the risk is not excluded in the policy.
• Third party liability: FUBON will indemnify the Insured the amounts which the Insured shall become legally liable to pay as damages consequent upon:
• accidental bodily injury to or illness of third parties (whether fatal or not)
• accidental loss of or damage to property belonging to third parties
• all costs and expenses of litigation
• all costs and expenses incurred with the written consent of FUBON
3. ELECTRONIC EQUIPMENT INSURANCE
a. Subject Matter Insured
All machines and equipment used for construction/ erection process such as cranes, loaders, excavators, concrete mixers…
b. Scope Of Cover
Cover for physical damage due to unexpected and unforeseen risks forall machines and equipment used for construction/ erection processoccurs during operation, standby or maintenance work by the risk is not excluded in the policy.
4. ELECTRONIC EQUIPMENT INSURANCE
a. Subject Matter Insured
Electronic equipmentused in such fields as broadcasting, television, telecommunications, medical, information technology, movie, marine, aviation, science & technology…
b. Scope Of Cover
• Material damage
Cover for physical damage due to unexpected and unforeseen risks for electronic equipment, data processing equipment, medical equipment ... caused by fire, lightning, short circuit and the other causes of power, design errors, manufacturing, installation, material defect...
• External data media
Cover for the cost of repairs, replacement of peripherals and recovery lost information occurred by insured risks.
• Increased cost of working.
Cover for the additional costs of replacement for damaged equipment occurred by insured risks.
STT | MÃ | TÊN SẢN PHẨM | TÀI LIỆU TẢI VỀ |
|
1 | CAR | Bảo hiểm mọi rủi ro xây dựng (công trình) | QUY TẮC BẢO HIỂM | GIẤY YÊU CẦU BH |
2 | CPM | Bảo hiểm máy móc xây dựng (công trình) | QUY TẮC BẢO HIỂM | |
3 | EAR | Bảo hiểm mọi rủi ro lắp đặt | QUY TẮC BẢO HIỂM | GIẤY YÊU CẦU BH |
4 | EEI | Bảo hiểm thiết bị điện tử | QUY TẮC BẢO HIỂM | |
5 | MBI | Bảo hiểm đổ vỡ máy móc | QUY TẮC BẢO HIỂM | GIẤY YÊU CẦU BH |
6 | CCR | Bảo hiểm Bắt buộc Công trình trong thời gian xây dựng | QUY TẮC BẢO HIỂM | GIẤY YÊU CẦU BH |
7 | BAP | Bảo hiểm nồi hơi và thiết bị áp lực | QUY TẮC BẢO HIỂM | GIẤY YÊU CẦU BH |
8 | CWC | Bảo hiểm bắt buộc đối với người lao động thi công trên công trường | QUY TẮC BẢO HIỂM | GIẤY YÊU CẦU BH |
9 | CCP | Bảo hiểm trách nhiệm nghề nghiệp cho kiến trúc sư và kỹ sư tư vấn | QUY TẮC BẢO HIỂM | GIẤY YÊU CẦU BH |
Tài liệu khác


Fubon Vietnam sincerely commits
plays an important role in helping customers and businesses
solve problems early and hastening the resolution of the situation.